Method Statement None Inflatables

1. Upon arrival, The driver will take note of any safety information or displays and adhere to the rules of the site at all times.

2. The driver will ensure that whilst the vehicle is on a designated carriageway of road surface, the rules of that specific highway are bided by at all times.

3. Should the vehicle be required to travel on any undesignated areas, such as verges or footways, the vehicle will travel at a maximum of 10 miles per hour with the hazard lights flashing at all times. In these specific areas and/or other highly populated areas, the use of a banks person is recommended but not compulsory.

4. The area will then be inspected for suitability,

5. It is imperative that guests or other persons involved in the event do not encroach on the set up area unless specifically requested to do so. NOTE* All equipment to be erected as per manufacturers / Health & Safety guidelines & under no circumstances can this be compromised in any way, regardless of aesthetics or the discretion of the venue/ organisers.

6, Upon completion of the hire. We will return and collect the equipment and place back into the collection vehicles.

7. When dealing with larger items, the collection vehicle may be required to drive to individual items for collection. Again, the vehicle will travel at a maximum of 10 miles per hour with the hazard lights flashing at all times. In these specific areas and/or other highly populated areas, the use of a banks person is recommended but not compulsory & the rules of the site will be observed at all time.

8. The area will then be checked for debris & other accessories, which will be dealt with accordingly.

9. The delivery vehicle will then depart the site, in a similar manner to that described above, again taking note of any instructions given or signing in place